How long does it take to Build Custom Software?

  • Home
  • Blog
  • How long does it take to Build Custom Software?

How long does it take to Build Custom Software?

The custom software development is a way to represent the brand in the most unique possible way. In this blog we will particularly focus on the timeframe that is required to build a custom software. As the small ventures will of course have a little time frame and will have their custom software ready whereas the larger the venture longer it will take to build custom software.

How long does it take to Build Custom Software

What affects the Development Time?

There are many factors that particular can affect the overall development time for the user, the first one being the development scope and the complexity that the business users requires, as the basic features requires only a time frame of 2-3 months whereas on the other hand the enterprise venture with the multiple integration requires almost a year time.

The next factor that affects the development time is the customization needs, as the more the level of customization more will be the required time in designing, coding and testing. The third component is the team Size and Expertise that the venture holds, as in most of cases a larger team with the trusted and experienced developers can complete the development projects just within a timeframe of a few months as it works on dividing the tasks efficiently. The team of developers should also be expert in the programming language to make the development process easy and quick.

The choice of programming languages, frameworks, and the software tools can also significantly impact the speed of the development of custom software, as the modern frameworks usually comes with the reusable components that helps the user in reducing the overall development time.

Estimated timeframes for the Custom Software Development

Small-Scale Projects it takes a timeframe of 2–3 Months

  • The small-scale projects include the simple mobile application development, the basic website development and the different sets of internal tools.
  • These small-scale projects have a limited feature, requires a minimal integration, and also provides the user with a simple interface.

Medium-Scale Projects it takes a timeframe of 4–9 Months

  • The medium scale projects include the CRM systems, e-commerce platforms, or the POS systems.
  • It helps the user with the moderate customization, also works on the third-party integrations and making an interactive user interface.

Large-Scale Projects it takes a timeframe of 10–18 Months and may be more in a few cases

  • Large-Scale Projects can be understood as the ERP systems like Odoo, the enterprise-grade applications.
  • It provides the user with an extensive customization, helps them with the multiple integrations with the different external systems, it is used for the complex workflows, and the unique business requirements.
Meet the Expert

Decoded Timeline for the Software Development

There are various phases that the software development goes through and each of these phases have their own required time, the first stage is the Requirement Analysis which is the first step towards the development and takes around 2–4 Weeks roughly to understand the business, the clients requirement and the market standards.

The next stage is the Design Phase that takes a time of 3–6 Weeks, here the process is to develop the wireframes for the user, then move to the UI/UX designs, and at last the architectural plans, the third stage is the Development Phase which takes the time of 3–12 Months and the codes are written here by the developers.

The second last phase is the Testing Phase that requires a timeframe of 4–8 Weeks, this phase can be exceed as the developer here checks each and every development, the user here conducts the functional testing, the extensive performance testing, the security assessments, and also works on fixing the bugs.

The last phase in the development of the custom software is the Deployment & Maintenance, which is always an on-going phase as it keeps on developing with the market trends and the business requirements.

Meet the Expert

Frequently Asked Questions

As the timeframe for the custom software cannot be fixed or predicted, the cost for the development of a custom software can also vary on the basis of the company size, the range of functionality demanded by the user. Although the average cost lies at $50,000, which depends on business to business.

The rough time frame to have a custom AI software is somewhere around 6 to 12 months, depending on the business need and requirement.

The custom software requires a long time compared to the normal business software as it caters the specific business requirements, and do not work on a pre-defined and pre-build modules and applications.

Build means a software version that is ready to be tested in the real- world. It also comes in with the latest changes and also the additions to make an advanced codebase.

The average time range to build a database is 4-6 months, 8it is an important part of the users business.

There are a few proven ways to accelerate the process of Software Development, like the user can Use the agile methodologies that further delivers the incremental updates. The user can also leverage the functioning of the low-code platforms like Odoo Studio that assist user in fast prototyping.